Inspection and approval of safety device drawings

Implemented

Rail R

Accident

28.1.1999

B1/1998R/S97

Recommendation

In the design and planning of modifications in signalling equipment, checking and approval of the modification drawings shall be completed prior to the commencement of the modification work.