Developing locking conditions of a route in the railway safety system

Implemented

Rail R

Accident

20.5.1998

C5/1997R/S73

Recommendation

Blocking of a travel route should be modified so as not to enable operation of the turnout of a blocked section until the track circuit section has first been occupied and then cleared.