Inspection after derailment in a railway yard

Implemented

Rail R

Accident

21.1.2005

C5/2004R/S195

Recommendation

Following each derailment incident on a railway yard, the turnouts and points and switches area should be inspected and the gauge and the height deviation checked by measuring.