Inspection after track support installation, adding ballast
Implemented
Rail R
Accident
28.10.1997
C23/1997R/S60
Recommendation
In seasons with possibly considerable temperature variations, ballasting should regularly be checked and supplemented after tamping and sleeper replacement operations. No train traffic should be allowed on tracks with uncompleted track work.
Investigation report
C23/1997R Freight Wagons Derailing in Kemi, on June 9, 1997