Inspection after track support installation, adding ballast

Implemented

Rail R

Accident

28.10.1997

C23/1997R/S60

Recommendation

In seasons with possibly considerable temperature variations, ballasting should regularly be checked and supplemented after tamping and sleeper replacement operations. No train traffic should be allowed on tracks with uncompleted track work.