Instructions on the staffing of signal boxes during exceptional circumstances
Implemented
Rail R
Accident
20.5.1997
C6/1996R/S22
Recommendation
Whenever an interlocking features exceptional situations, e.g. as due to on-going work, the interlocking manning shall be specified in a relevant plan. In such situations, any additional manning should be ensured, if necessary, and the plan should consider unpredictable situations possibly arising from the work.